Projects

ABN Agri

A Brand-New vacuum system was supplied and installed at the Bury St Edmunds Mill. 

Mechway, supported by Karcher helped to survey and advise the correct vacuum system for the ABN mill based in Bury St Edmunds. Site visits and Project meetings were held with the Production Manager and his cleaning team to understand the requirements of the mill and their cleaning requirements. 

Being a feed mill, the equipment had to be Zone 22 Atex rated and with the size of the vacuum pipework a suitable vacuum needed to be spec’d to meet demands. 

X2 Atex rated 3 phase karcher stainless steek vacuums and tooling were supplied along with upgrades to the mills steel pipework. Additional hi-level cleaning kits were also supplied. 

What We Installed

X2 Karcher IVS 100/75 M Z22 Vacuums, multiple connection points and fixtures.  

Mechway arranged the transportation, installation team and plant for the installation of the system and was completed on time and within a budget. 

Hi-level cleaning kit

A new carbon fibre hi-level cleaning kit was supplied to assist with the dust and debris removal from ducting an pipework around the facility. eliminating the need for steps or MHE to clean, which in turn reduced the risk to staff.